Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 10lb Tub / 60 Day Supply
Absorbine Flex+Max Horse Joint Supplement Pellets, Highly Palatable, Comprehensive Equine Formula with Glucosamine, MSM, Chondroitin & Flaxseed, 10lb Tub / 60 Day Supply
About This
- Every serving delivers: 10,000 mg of glucosamine - 5,000 mg of MSM - 1,200 mg of chondroitin - 150 mg of HA - 130 mg of Boswellia serrata - plus flaxseed and rice bran.
- Use at the first signs of stiffness & no loading dose required. Optimized pellets for advanced joint health and mobility - no fillers!
- Highly concentrated formula supports a horse's muscle, tendon, ligament, synovial fluid, and cartilage health.
- Administer once daily. A 5lb bag is a 30 day supply / a 10lb bag is a 60 day supply.
- Made in the USA.
Product features
Product features
Materials and care
Materials and care
Merchandising tips
Merchandising tips
Share

TrailTrot Pet – Where Every Adventure Begins 🐾
Whether you’re hitting the trails, exploring the city, or enjoying cuddle time at home, TrailTrot Pet is here to keep tails wagging and adventures endless.
Blog posts
View all-
Hydration for Hikers and Hounds: Why Water Matt...
Keeping your dog hydrated is the simplest way to prevent heat exhaustion and fatigue on hikes. Learn smart hydration habits and discover gear that makes water stops effortless and fun.
Hydration for Hikers and Hounds: Why Water Matt...
Keeping your dog hydrated is the simplest way to prevent heat exhaustion and fatigue on hikes. Learn smart hydration habits and discover gear that makes water stops effortless and fun.
-
“Cold Weather Adventures: Keeping Your Dog Warm...
Winter hiking with your dog can be unforgettable — if you’re prepared. Discover the must-have gear and habits that keep your pup warm, hydrated, and safe on snowy trails.
“Cold Weather Adventures: Keeping Your Dog Warm...
Winter hiking with your dog can be unforgettable — if you’re prepared. Discover the must-have gear and habits that keep your pup warm, hydrated, and safe on snowy trails.
-
“Between Seasons: How to Prep Your Dog for the ...
November is the month of transition. Learn how to adapt your dog’s walking routine, gear, and care for the chilly season ahead — from hydration tips to skin protection and...
“Between Seasons: How to Prep Your Dog for the ...
November is the month of transition. Learn how to adapt your dog’s walking routine, gear, and care for the chilly season ahead — from hydration tips to skin protection and...
Frequently Asked Questions
How long does shipping take?
Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.
How can I get a tracking number for my order?
If your order has been shipped, we will add the tracking number to your order and notify you via the email address you entered when ordering.
Is free shipping available?
We do not currently offer free shipping. However, this may be added at some point. We apologize.
How do I process a return or exchange?
For returns or exchanges, please contact us within 14 days of receiving the product, along with a receipt or screenshot of the purchase, and a photo of the product with the packaging or tag intact.